General Stamping Company
ISO9001:2008 Certified

Progressive Die Stamping of a 260 Brass Ground Cap for the Power Distribution Industry

General Stamping Company was contracted by a customer in the power distribution industry for a progressive die stamping project of a 260 brass ground cap. This project incorporated die design and manufacturing of a single piece and tooling inserts, as well as the actual die stamping. Being known for our quality and engineering expertise, we were the perfect partners for this customer.

We used our state of the art 30 ton high speed Bruderer press to create a ground cap measuring .750" X .105" X .415" within tightness tolerances of ±.001". To test the part and ensure it met the customer's specifications, we performed set-up inspections and in-process batch control testing. The part was indeed exactly what was required and has been produced for over 10 years.

Allow General Stamping to design and manufacture dies for your projects, and complete the vision with precision metal stamping. Contact us to learn more.

Request Quote

Progressive Die Stamping of a 260 Brass Ground Cap for the Power Distribution Industry
Progressive Die Stamping of a 260 Brass Ground Cap for the Power Distribution Industry

click the image to enlarge

Highlights of this Progressive Die Stamping Project

Product Description Power distribution products, ground cap.
Progressive Die Stamping Capabilities Applied/Processes Primary:
Die Design & Manufacturing
Progressive Die/Single Pieces
Tooling Inserts Used to Produce a Similar Part for the Same Customer
Die Stamping
Secondary:
Bare, no finish.
Equipment Used to Manufacture Part 30 Ton high speed Bruderer press.
Overall Part Dimensions .750" X .105" X .415"
Tightest Tolerances +/-.001"
Material Used 260 Brass - ½ Hard
Thickness: 0.026"
In process testing/inspection performed SUI (Set-up inspection), in process batch control.
Industry for Use Power Distribution Industry
Volume Medium Volume
  • Part Has Been Produced for Over 10 Years
  • Usage 500,000/year
Delivery/Turnaround Time 2-4 Weeks after receipt of order.
Delivery Location Southern United States
Product Name Ground Cap

View Other Past Projects

Back To Top